Projects
02 Apr 2016

Rebuilt a block wall in places and rendered the 20m length and adding coping stones to finish off.
02 Apr 2016

Removal of wood porch and replaced with new rendered block work and UPVC windows and door.
02 Apr 2016

What was once two rooms with two entrance doorways, is now a large open room with new T&G wood flooring.