July 2015 Plaster renovation of kitchen be Video
-
- 1645 view(s)
- 0 comment(s)
A 10 day project that involved; removal of kitchen units & tiles on 2 walls, removal of loose plaster on 3 walls, dub out and float coat with sand and cement and re-skim walls and add new beads and sills to window reveals.
August 2015 – Relay of Patio Slabs
A project to include pressure washing and removal of existing patio slabs; levelled the ground with new concrete and re-laid slabs to original pattern and re-pointed with sand and cement.